(Except One.)
I just may have mentioned that I have been casting on new projects even though there have been others on the needles. And it really hasn't bothered me which, considering older posts, is quite a surprise.
Here is a photo of all my project bags containing WIPs.
To save you counting there are seven and I forgot the never ending shawl.
The blue bag at the back contains this shawl.
This is a pattern that requires concentration so I do not get to work on it every day. There are now over 500 stitches but I am only 6 rows from the bind off. I am playing yarn chicken as I want to use all the yarn as it is a gradient but I certainly do not want to have to undo any rows.
From left to right the projects are as follows.
A hat for charity that I started on the way home from vacation. The pattern is Better Late Than Never Beanies and will be the second one I have made. The project is in a plastic bag as I just grabbed the bag of yarn and crochet hook before going away and have not put the project in a different bag.
Next in the bag shown here is this project which I started on vacation and seems to be only-on-vacation project. Although when I finish some of the other projects then I'm sure I'll pick it up again. I'm not quite half-way through.
This is nearly finished; 6 rows before bind off. This is the other project where I am playing yarn chicken although I will not mind too much if I have to undo any rows if I run out of yarn too soon as I have already undone over 50 rows when I found a mistake.
The butterfly bag has this project.
They are some mittens for a Christmas present. I started them so that I can slowly work on gift knitting this year plus I needed something simple to work on and the rib fit the bill. I am loving how this yarn is knitting up and feel a little sad that it is a gift and not for me.
The bag that says fiber space contains, funnily enough, the yarn I bought at that store. I had purchased two skeins of a DK weight to make a two-coloured shawl but I did not have a pattern in mind. On 4 August a new shawl pattern was released and I decided the yarn would work and as the designer was holding a KAL, I cast on.
The brown paper bag contains the yarn and project for the mystery shawl. Originally they were going to go into the butterfly bag but I took that when I needed a bag to take the mitten out of the house. Just have to make a decision which bag I want to use.
Apart from the never ending shawl, there is one other project missing from this line up; a sock I cast on at the beginning of the year. I decided fairly early on that the yarn and pattern were not a good mix but as I do not have any plans for the yarn and have plenty of other knitting, I have not rushed to frog them.
In the past I would have felt a bit antsy that I had so many projects on the go but I am actually quite happy with this number. Three seemed to have been set aside for working on at a specific time/location and one is a mystery so cannot be worked on all the time and two are very close to being finished.
No comments:
Post a Comment