Thursday, June 5, 2014
Nature Abhors a Vacuum
Life, um I mean my stash, took an exciting turn on Monday; I sold some yarn and my stash went down by 5 balls. But yesterday it went back up to the same number as I had to buy yarn for gift knitting. Oh well, I better get knitting.
Monday, June 2, 2014
We're All Looking For A Quick Fix, But........
I was browsing the new groups on Ravelry at the weekend and one of the groups I took a closer look at was Knit N’ Fit 3-week Challenge. The idea of the group to motivate each other in reaching personal health goals in eating and exercise.
The premise sounds good so I looked at the posts made by the group leader (who is in her twenties). She starts off with a post about putting on weight and the decision to get healthy, all good so far until she mentions one plan where she lost 15 pounds in three weeks, most of that in the first 14 days. What? This is not someone who is so morbidly obese that a slight reduction in calories will result in that sort of weight loss. How limited were her calories to lose almost a pound a day, (she said most of the 15 pounds was in 14 days) and how come she wasn't losing weight after that. My guess is that her body had adjusted to the reduced calorie load because it was too low.
I then looked at her other posts and amongst these she spoke about keeping carbohydrates in moderation and in one recipe there was much more protein than carbs. Once again someone has confused all carbs with bad carbs. ie refined carbohydrates are not good therefore all carbohydrates are bad. The majority of our calories should be coming form carbohydrates but that shouldn't be white bread and sugar. In the same way as fat is essential in our diet, it shouldn't be obtained through high calorific trans fat.
What is sad about this group and the host is that she means well and it is good to motivate others for fitness and health but not when your information is just plain wrong.
The premise sounds good so I looked at the posts made by the group leader (who is in her twenties). She starts off with a post about putting on weight and the decision to get healthy, all good so far until she mentions one plan where she lost 15 pounds in three weeks, most of that in the first 14 days. What? This is not someone who is so morbidly obese that a slight reduction in calories will result in that sort of weight loss. How limited were her calories to lose almost a pound a day, (she said most of the 15 pounds was in 14 days) and how come she wasn't losing weight after that. My guess is that her body had adjusted to the reduced calorie load because it was too low.
I then looked at her other posts and amongst these she spoke about keeping carbohydrates in moderation and in one recipe there was much more protein than carbs. Once again someone has confused all carbs with bad carbs. ie refined carbohydrates are not good therefore all carbohydrates are bad. The majority of our calories should be coming form carbohydrates but that shouldn't be white bread and sugar. In the same way as fat is essential in our diet, it shouldn't be obtained through high calorific trans fat.
What is sad about this group and the host is that she means well and it is good to motivate others for fitness and health but not when your information is just plain wrong.
Saturday, May 31, 2014
And Then There Was One
Last week I wrote that I should have four completed projects and I do. Although the unfinished project is not the one that I was expecting but I'm not complaining because four is what I wanted and four is what I got. And when I say finished, I mean finished, blocked and ends sewn in, all that's missing are the final pictures.
I did finish the shawl. As Monday was a holiday, I decided it would be a good time to not do the normal Monday chores and spend time blocking the shawl. I am so glad I did because I love it. (This was the project I didn't expect to finish.)
I'm glad I wrote a list because I actually embroidered the face on a toy. I didn't enjoy it but I did it. The item I didn't finish was the skirt. I picked up stitches along the waistband and I just need to insert elastic and cast off. I could finish it this week except there are two gifts that have to take priority. I am not going to promise myself that it will be finished in a week's time but it will be worked on as soon as the gifts are finished.
Look out for a post with photos. Actually I'll make that a priority after the gift projects.
I did finish the shawl. As Monday was a holiday, I decided it would be a good time to not do the normal Monday chores and spend time blocking the shawl. I am so glad I did because I love it. (This was the project I didn't expect to finish.)
I'm glad I wrote a list because I actually embroidered the face on a toy. I didn't enjoy it but I did it. The item I didn't finish was the skirt. I picked up stitches along the waistband and I just need to insert elastic and cast off. I could finish it this week except there are two gifts that have to take priority. I am not going to promise myself that it will be finished in a week's time but it will be worked on as soon as the gifts are finished.
Look out for a post with photos. Actually I'll make that a priority after the gift projects.
Tuesday, May 27, 2014
I Have A Little List
I listen to ABC radio. The A stands for Australian. I like listening to it during the day as it is night time in Australia so there is not too much chatter. It can get a bit confusing though when they give the day/date as one time I panicked a little as I thought I had forgotten my sister's birthday. But, of course, the radio station was already on the next day.
The other day they played The Daleks performing Gilbert and Sullivan. It was funny for, let's say, 30 seconds. Would a Whovian play it for longer?
Anyway, I thought of that when I was writing my list of projects I have to work on this week. It really wasn't practical to keep referring to Saturday's post for what I should be working on so I wrote a list. Nothing fancy, just in the order they appeared in the post and just what the item is. I wrote the list last night and I could immediately check off 1 1/2 projects. :) The list is not in the order I have to work, just an aide-mémoire, but seeing it in writing has me convinced to work on the project that I was most likely to put off. Especially as I like to see things completed that were on my to do list.
The other day they played The Daleks performing Gilbert and Sullivan. It was funny for, let's say, 30 seconds. Would a Whovian play it for longer?
Anyway, I thought of that when I was writing my list of projects I have to work on this week. It really wasn't practical to keep referring to Saturday's post for what I should be working on so I wrote a list. Nothing fancy, just in the order they appeared in the post and just what the item is. I wrote the list last night and I could immediately check off 1 1/2 projects. :) The list is not in the order I have to work, just an aide-mémoire, but seeing it in writing has me convinced to work on the project that I was most likely to put off. Especially as I like to see things completed that were on my to do list.
Saturday, May 24, 2014
Finish Something Why Don't You
I need a plan.
A couple of things happened this week that made me realise that I need to finish some things.
Firstly, I had book group this week. Not only did I have to finish the book but I had to cast on a new project to take with me. Secondly, a friend and I were going to have a fun knitalong for May Gray but I couldn't start it yesterday because both sets of needles in the size I wanted to use were on other projects and one of those projects just needs to be cast off.
The problem is that I like to do something else while I'm knitting, read, watch a movie, chat with friends, but the finishing stages of a project require more concentration. Action is required to actually finish some projects otherwise I will keep adding to them.
So here we go, the projects that are almost finished but not quite.
I have three projects that are actually off the needles but need finishing touches. There's the tea cosy which needs seaming and a drawstring tie. This isn't an abandoned project because I have worked on it each week this month. The tie would be perfect for working on at knit group. I finally finished the cast off for the close-to-being-finished shawl. Now it needs to be blocked. This is something that takes time and cannot be hurried so I will have to block (ha pun?) off some time on my calendar. The third item not on needles but not finished is a toy that needs a face. I find with these things that the embroidery does not take any time, its making sure each feature is in the right place that takes time and care.
Then I have two items that are two rows away from being finished. Firstly the previously mentioned project with the needles I want. It is a sewn bind off in dark wool which won't take very long but I need to do it in daylight. And the other item is the skirt I have been working on for a long time - it's stocking stitch in the round so saved for things like book club - I need to pick up stitches around the waist band, insert elastic and cast off.
So really, apart from the shawl, these projects won't take too long to finish, I just need some daylight hours.
Plan, simple really, pick one project a day and finish it, starting with the easiest. Then I should have four completed projects to report on next week.
A couple of things happened this week that made me realise that I need to finish some things.
Firstly, I had book group this week. Not only did I have to finish the book but I had to cast on a new project to take with me. Secondly, a friend and I were going to have a fun knitalong for May Gray but I couldn't start it yesterday because both sets of needles in the size I wanted to use were on other projects and one of those projects just needs to be cast off.
The problem is that I like to do something else while I'm knitting, read, watch a movie, chat with friends, but the finishing stages of a project require more concentration. Action is required to actually finish some projects otherwise I will keep adding to them.
So here we go, the projects that are almost finished but not quite.
I have three projects that are actually off the needles but need finishing touches. There's the tea cosy which needs seaming and a drawstring tie. This isn't an abandoned project because I have worked on it each week this month. The tie would be perfect for working on at knit group. I finally finished the cast off for the close-to-being-finished shawl. Now it needs to be blocked. This is something that takes time and cannot be hurried so I will have to block (ha pun?) off some time on my calendar. The third item not on needles but not finished is a toy that needs a face. I find with these things that the embroidery does not take any time, its making sure each feature is in the right place that takes time and care.
Then I have two items that are two rows away from being finished. Firstly the previously mentioned project with the needles I want. It is a sewn bind off in dark wool which won't take very long but I need to do it in daylight. And the other item is the skirt I have been working on for a long time - it's stocking stitch in the round so saved for things like book club - I need to pick up stitches around the waist band, insert elastic and cast off.
So really, apart from the shawl, these projects won't take too long to finish, I just need some daylight hours.
Plan, simple really, pick one project a day and finish it, starting with the easiest. Then I should have four completed projects to report on next week.
Thursday, May 22, 2014
Tea Cosy Tuesday umm Thursday?
Last week I said that I had joined in the fun for the May cosy and that I had even made all the parts. I thought I had posted photos of the parts - but no. So here are photos of the front and back of the cosy, which were knitted, and the crocheted flowers. These were the parts completed by last week. And then there is a picture of the flowers sewn on. I do have some buttons that I could sew into the middle of the flowers but they would completely cover the yellow centre and then what is the point of the centre being a different colour.



I still have to embroider the stems and leaves and then sew up the sides. A completed project to show next week?
I do have a completed project to show off this week. It is an oddball blanket which I signed up for as the requirement was for variegated yarns - any pattern - and I had some in my stash. I decided to use a purpley colour left over from a previous blanket. I wanted a pattern a bit more interesting than straight stocking stitch so I found the knot pattern in one of my stitch dictionaries. It is a simple pattern; the knot is worked by purling three together, then knitting the same three stitches together and then purling them together again.


I haven't signed up for any more blankets but I have not ruled out not working on any more.
I completely used up the yarn on my part of the blanket so that counts as a ball out plus I sold two skeins of yarn in my stash so I have reduced yarn in by two balls and associated meterage. Talking about stash, following some brain storming with knitterly friends I am now looking at some yarns in my stash in a different light, also there are some yarns I might sell. This is making my stash seem less of a burden and actually something I can reduce.


I still have to embroider the stems and leaves and then sew up the sides. A completed project to show next week?
I do have a completed project to show off this week. It is an oddball blanket which I signed up for as the requirement was for variegated yarns - any pattern - and I had some in my stash. I decided to use a purpley colour left over from a previous blanket. I wanted a pattern a bit more interesting than straight stocking stitch so I found the knot pattern in one of my stitch dictionaries. It is a simple pattern; the knot is worked by purling three together, then knitting the same three stitches together and then purling them together again.
I haven't signed up for any more blankets but I have not ruled out not working on any more.
I completely used up the yarn on my part of the blanket so that counts as a ball out plus I sold two skeins of yarn in my stash so I have reduced yarn in by two balls and associated meterage. Talking about stash, following some brain storming with knitterly friends I am now looking at some yarns in my stash in a different light, also there are some yarns I might sell. This is making my stash seem less of a burden and actually something I can reduce.
Friday, May 16, 2014
Finished Friday
I was all excited about this post as I thought I had a few projects to show off but it turns out that I only have two. Even so two is better than none.
Firstly socks. This is another pattern - Lindsay - from Sock Innovation by Cookie A and is the third pattern from the book that I have made the others being Rick that I made way back in 2009/10 and Wanida that I finished recently.
I want to show some close ups of the yarn. I purchased it at the end of 2011 because I liked the way it was dyed although I had no idea what to make with it as I thought that plain stocking stitch would show it off best but I did not want to knit plain socks.


The colourway is named Christmas Lights and the yarn 80% merino, 20% nylon feels soft. Unfortunately the dyer is no longer dying yarn.
I followed the pattern as written although I was a bit wary about the garter stitch heels and toes but as this is knit at fine gauge they did not come out bulky.

If you're thinking that one looks bigger then the other - you're right. I blocked only one so I could see if there was any difference.
The other item finished was a hat for Operation Gratitude. It is a crochet pattern that can be found here. I used two colours of Vanna Choice yarn that I had purchased recently. I used the size hook stated in the pattern rather than the hook size on the yarn label which I would usually do. So my hat isn't very slouchy but is a good hat nonetheless. This was a quick crochet.

At the beginning of the week when I said I had won some yarn, I forgot to post a photo. So here is the yarn I won from the Operation Gratitude group on Ravelry.

Firstly socks. This is another pattern - Lindsay - from Sock Innovation by Cookie A and is the third pattern from the book that I have made the others being Rick that I made way back in 2009/10 and Wanida that I finished recently.
I want to show some close ups of the yarn. I purchased it at the end of 2011 because I liked the way it was dyed although I had no idea what to make with it as I thought that plain stocking stitch would show it off best but I did not want to knit plain socks.
The colourway is named Christmas Lights and the yarn 80% merino, 20% nylon feels soft. Unfortunately the dyer is no longer dying yarn.
I followed the pattern as written although I was a bit wary about the garter stitch heels and toes but as this is knit at fine gauge they did not come out bulky.
If you're thinking that one looks bigger then the other - you're right. I blocked only one so I could see if there was any difference.
The other item finished was a hat for Operation Gratitude. It is a crochet pattern that can be found here. I used two colours of Vanna Choice yarn that I had purchased recently. I used the size hook stated in the pattern rather than the hook size on the yarn label which I would usually do. So my hat isn't very slouchy but is a good hat nonetheless. This was a quick crochet.
At the beginning of the week when I said I had won some yarn, I forgot to post a photo. So here is the yarn I won from the Operation Gratitude group on Ravelry.
Monday, May 12, 2014
May Madness
I was bored with WIPping Wednesdays so I have gone for a new alliteration. Like many potential posts, this one was written in my head at the beginning of the month but is only now making it into print.
We are almost halfway through the month and I am now writing about beginning of the month challenges. Place in context if possible.
The start of each month brings a new set of challenges. For me it is sock knitters, Operation Gratitude and tea cosies. Away from Ravelry it is the books of the month suggested by Amazon. But I'm just talking knitting/crochet challenges today. Firstly, I know that I do not have to take part in any of the challenges but I have pledged to myself that I will make something for Operation Gratitude each month, also as I want to use up all my sock yarn starting a challenge from the sock knitters group is a good way to go, and why not throw a tea cosy into the mix. Although I will only follow that challenge if I have yarn in my stash hence not making the last two.
The Operation Gratitude project I start straight away regardless of what else I have on the go. Once again the administrator came up with hats and I chose the crochet option using two colours that I bought last month specifically for this purpose. I can't count either of them as balls of yarn out but they are on their way. This hat is finished and will appear in a finished project round up soon.
Having finished a pair of socks at the beginning of the month I decided to dig into my sock yarn stash and start a pair to fit the current month's challenge:- Featured Techniques: Flora/fauna or Science/technology/geek: Featured Designers: Rachel Coopey and Nicki Miller. Looking through my queue and favourites on Ravelry I decided on this pattern, using yarn that I had purchased in Calgary to make gloves. Although the original purpose for the yarn does not matter as long as I use it. I have not got very far with these but the socks I did finish will appear soon.
Finally I decided to take part in the monthly tea cosy pattern. The pattern was for a small size and I do not have any cosies specifically for my small tea pot plus I had yarn in my stash. All the knitting and crochet is complete I just need to sew all the parts together.
And then we come to the projects that were already on the needle at the start of the month. Despite starting the other projects listed above, I have been working on the mittens, one is completed except the bind off at the cuff and the other needs a thumb and cuff but I haven't touched the cast off of the shawl.
And there is another project to throw into the mix. Last week I received an oddball blanket. I put my name down for this one at the beginning of January as it was to be worked in variegated yarn and I had some I could use up. I chose a simple pattern and started on my section last night and I should finish by the end of the week.
I do not record meters out until I have shown photos of finished items so meters knitted/crocheted has not gone up but yarn in has gone up because I was given some yarn. I won Operation Gratitude's group drawing at the end of April and chose yarn. I am hoping I will be able to turn it into projects for Operation Gratitude.
We are almost halfway through the month and I am now writing about beginning of the month challenges. Place in context if possible.
The start of each month brings a new set of challenges. For me it is sock knitters, Operation Gratitude and tea cosies. Away from Ravelry it is the books of the month suggested by Amazon. But I'm just talking knitting/crochet challenges today. Firstly, I know that I do not have to take part in any of the challenges but I have pledged to myself that I will make something for Operation Gratitude each month, also as I want to use up all my sock yarn starting a challenge from the sock knitters group is a good way to go, and why not throw a tea cosy into the mix. Although I will only follow that challenge if I have yarn in my stash hence not making the last two.
The Operation Gratitude project I start straight away regardless of what else I have on the go. Once again the administrator came up with hats and I chose the crochet option using two colours that I bought last month specifically for this purpose. I can't count either of them as balls of yarn out but they are on their way. This hat is finished and will appear in a finished project round up soon.
Having finished a pair of socks at the beginning of the month I decided to dig into my sock yarn stash and start a pair to fit the current month's challenge:- Featured Techniques: Flora/fauna or Science/technology/geek: Featured Designers: Rachel Coopey and Nicki Miller. Looking through my queue and favourites on Ravelry I decided on this pattern, using yarn that I had purchased in Calgary to make gloves. Although the original purpose for the yarn does not matter as long as I use it. I have not got very far with these but the socks I did finish will appear soon.
Finally I decided to take part in the monthly tea cosy pattern. The pattern was for a small size and I do not have any cosies specifically for my small tea pot plus I had yarn in my stash. All the knitting and crochet is complete I just need to sew all the parts together.
And then we come to the projects that were already on the needle at the start of the month. Despite starting the other projects listed above, I have been working on the mittens, one is completed except the bind off at the cuff and the other needs a thumb and cuff but I haven't touched the cast off of the shawl.
And there is another project to throw into the mix. Last week I received an oddball blanket. I put my name down for this one at the beginning of January as it was to be worked in variegated yarn and I had some I could use up. I chose a simple pattern and started on my section last night and I should finish by the end of the week.
I do not record meters out until I have shown photos of finished items so meters knitted/crocheted has not gone up but yarn in has gone up because I was given some yarn. I won Operation Gratitude's group drawing at the end of April and chose yarn. I am hoping I will be able to turn it into projects for Operation Gratitude.
Wednesday, April 30, 2014
WIPping Wednesday (Last for April)
Another week without a finished item. I was expecting this but I have a couple of projects that are very close to completion; I just need to set some time aside.
Firstly there's the so-close-but-never-finished shawl. I pulled out two rows. I didn't put in a lifeline just proceeded carefully as one row was beads and YOs and decreases and the other row, although plain followed such a row so I had to make sure that I did not undo more than that row. I then added a lifeline so if I still do not have enough yarn to complete the cast off I can pull it out.
The other item close to completion are the socks I started a couple of weeks ago. All the knitting is completed and I just need to graft/kitchener the toes. Usually not a problem, except the socks were worked cuff down with short row toes which means the seam is across the width of the sock. So I have 32 stitches to kitchener in dark yarn - twice.
Having finished the socks I cast on a mitten. Yes I know it is not going to be cold enough for mittens even in Canada but I have had the pattern for a while and I bought the yarn on the yarn crawl last year especially for this pattern so I just decided to go for it. It is two colour knitting so something I can do during all the hockey play off games.
Firstly there's the so-close-but-never-finished shawl. I pulled out two rows. I didn't put in a lifeline just proceeded carefully as one row was beads and YOs and decreases and the other row, although plain followed such a row so I had to make sure that I did not undo more than that row. I then added a lifeline so if I still do not have enough yarn to complete the cast off I can pull it out.
The other item close to completion are the socks I started a couple of weeks ago. All the knitting is completed and I just need to graft/kitchener the toes. Usually not a problem, except the socks were worked cuff down with short row toes which means the seam is across the width of the sock. So I have 32 stitches to kitchener in dark yarn - twice.
Having finished the socks I cast on a mitten. Yes I know it is not going to be cold enough for mittens even in Canada but I have had the pattern for a while and I bought the yarn on the yarn crawl last year especially for this pattern so I just decided to go for it. It is two colour knitting so something I can do during all the hockey play off games.
Wednesday, April 23, 2014
WIPping Wednesday
After two weeks with finished items there's nothing to report this week. Nothing finished and nothing cast on. (Although I did restart the sock I cast on last week.)
I started the cast off of the always close-to-being-finished shawl and reached the half-way mark of the yarn before I reached the half-way point of the shawl. I undid what I had cast off (so glad I put in a life line) and now I have to work up the courage to frog the last worked row which has beads and YOs as well as K2togs and SSKs. A life line will calm the heart.
I am close to finishing one sock but I am not expecting a Finished Friday this week.
I started the cast off of the always close-to-being-finished shawl and reached the half-way mark of the yarn before I reached the half-way point of the shawl. I undid what I had cast off (so glad I put in a life line) and now I have to work up the courage to frog the last worked row which has beads and YOs as well as K2togs and SSKs. A life line will calm the heart.
I am close to finishing one sock but I am not expecting a Finished Friday this week.
Friday, April 18, 2014
Finished Friday
As I said on Wednesday I have two projects to show today. And looking at my current projects it will be at least a couple of weeks before I have any more finished items.
These two projects were finished on the same day.
Firstly socks. I started these on our recent trip to Spain. Start to finish was just over a month but I did not knit on them every day so actual knitting time was less.
The yarn is that shown at the end of this blog post and the pattern is Wanida by Cookie A from her book Sock Innovation. I have now knitted two patterns from this book and am just starting a third. Does that make up for the books where I have not knit one pattern?
The yarn feels soft knitted up even though this is a tight pattern. The socks fit but are a little tight so it will be interesting to see how much they stretch when worn. The yarn was a gift from my friend Clair - check out her store at Purple Gecko Studio. I did not think to check for errata before we went away. (When I first started knitting there were never mistakes in patterns and even now with mistakes all over the place it never occurs to me to check.) When I got to the heel there was obviously a mistake, which I could work out for myself how to remedy, but as we had free WiFi at that point I was able to check the publisher's errata.

The other finished project is a hat for Operation Gratitude. My aim is to make one project a month from the suggestions put forward by the group and I have managed that so far. I have been crocheting the hats but I chose the knit pattern this month as I needed a project for knit group. (Not that you have to knit at knit group, just that this month the knit hat pattern was easier than the crochet pattern.) Start to finish was five days. The pattern is Weather the Weather Hat available on Ravelry and I used Red Heart Soft and a size 5 mm circular needle. It is 40 cm in length and just the right size for adult hats until the end. I used half the ball of yarn. I was going to use the Paprika colour left over from the scarf but wasn't sure if I had enough. It would have been close so I'm glad I didn't try. I had bought the purple yarn earlier this year as I did not think I would have enough to finish this tea cosy. As it turned out I did not need it for the tea cosy which was a good thing as I am only knitting cosies from stash but the yarn could go to charity projects. (I had contemplated returning it to keep my yarn in down.)

These two projects were finished on the same day.
Firstly socks. I started these on our recent trip to Spain. Start to finish was just over a month but I did not knit on them every day so actual knitting time was less.
The yarn is that shown at the end of this blog post and the pattern is Wanida by Cookie A from her book Sock Innovation. I have now knitted two patterns from this book and am just starting a third. Does that make up for the books where I have not knit one pattern?
The yarn feels soft knitted up even though this is a tight pattern. The socks fit but are a little tight so it will be interesting to see how much they stretch when worn. The yarn was a gift from my friend Clair - check out her store at Purple Gecko Studio. I did not think to check for errata before we went away. (When I first started knitting there were never mistakes in patterns and even now with mistakes all over the place it never occurs to me to check.) When I got to the heel there was obviously a mistake, which I could work out for myself how to remedy, but as we had free WiFi at that point I was able to check the publisher's errata.
The other finished project is a hat for Operation Gratitude. My aim is to make one project a month from the suggestions put forward by the group and I have managed that so far. I have been crocheting the hats but I chose the knit pattern this month as I needed a project for knit group. (Not that you have to knit at knit group, just that this month the knit hat pattern was easier than the crochet pattern.) Start to finish was five days. The pattern is Weather the Weather Hat available on Ravelry and I used Red Heart Soft and a size 5 mm circular needle. It is 40 cm in length and just the right size for adult hats until the end. I used half the ball of yarn. I was going to use the Paprika colour left over from the scarf but wasn't sure if I had enough. It would have been close so I'm glad I didn't try. I had bought the purple yarn earlier this year as I did not think I would have enough to finish this tea cosy. As it turned out I did not need it for the tea cosy which was a good thing as I am only knitting cosies from stash but the yarn could go to charity projects. (I had contemplated returning it to keep my yarn in down.)
Wednesday, April 16, 2014
WIPping Wednesday (Third in April)
Another successful week of finished items.
Although one item was cast on and finished during the week so it wasn't a WIP for long. This was a hat for charity that I mentioned that I would cast on. I used yarn that I bought a couple of months ago that I thought I would need for the tea cosy but didn't end up using. This was my last unused ball of yarn suitable for charity knitting, so I had to buy some more.
Actually, it seemed from Michaels's flyer that they had a few kinds on sale but the branch I went to had just one type of washable worsted on sale. I bought three balls to keep me going for a few months. So yarn in has gone up but as I don't record a ball of yarn as "out" until it is mostly used I am not showing a reduction in balls of yarn used which is why I have metres knitted and crocheted to aim for that number to be higher than the number in. In is still higher than out but finishing a couple of my older WIPs will change that. Hmm, finishing the older WIPs? I really should set some time aside to cast off the shawl. I think one of the problems is that in the back of my mind I am concerned that I do not have enough yarn to complete the cast off. But I've already ripped out rows because I had more yarn than I thought so what will it matter if I have to undo part of a row?
The other item finished this week was a pair of socks. I measured them against a pair that fit well and decided that although they looked short they were the right size.
As the hat was my charity project for the month, it was not replaced with a new project but as I have sock yarn that should be turned into socks another one was cast on last night.
Although one item was cast on and finished during the week so it wasn't a WIP for long. This was a hat for charity that I mentioned that I would cast on. I used yarn that I bought a couple of months ago that I thought I would need for the tea cosy but didn't end up using. This was my last unused ball of yarn suitable for charity knitting, so I had to buy some more.
Actually, it seemed from Michaels's flyer that they had a few kinds on sale but the branch I went to had just one type of washable worsted on sale. I bought three balls to keep me going for a few months. So yarn in has gone up but as I don't record a ball of yarn as "out" until it is mostly used I am not showing a reduction in balls of yarn used which is why I have metres knitted and crocheted to aim for that number to be higher than the number in. In is still higher than out but finishing a couple of my older WIPs will change that. Hmm, finishing the older WIPs? I really should set some time aside to cast off the shawl. I think one of the problems is that in the back of my mind I am concerned that I do not have enough yarn to complete the cast off. But I've already ripped out rows because I had more yarn than I thought so what will it matter if I have to undo part of a row?
The other item finished this week was a pair of socks. I measured them against a pair that fit well and decided that although they looked short they were the right size.
As the hat was my charity project for the month, it was not replaced with a new project but as I have sock yarn that should be turned into socks another one was cast on last night.
Friday, April 11, 2014
Finished Friday
As mentioned in the last post, I have two finished items to show.
Firstly a baby hat. I found the pattern through a blog. It is Knit Baby Hat by Bernat. The pattern is worked flat and seamed but I changed to working on the round. I used Red Heart Soft left over from this hat so I worked the smallest size to allow for the thicker yarn. I also worked more increases as 20 stitches is too many to draw up especially with a worsted weight yarn.

The other finished item is a scarf knitted for charity. The suggestions for March were scarves - not my favourite thing to make. Mostly I have been crocheting the charity items as it is usually quicker but I didn't feel like crocheting a scarf so I chose the knitting pattern. It is the windward waves pattern (not capitalized) and is available on Ravelry. The pattern calls for three colours so ideal for using leftovers. The yarn had been used in the hats I made in January and February. With this pattern it was definitely advantageous to be able to knit backwards - ie moving stitches from the right needle to the left needle. I hadn't done this for a while and I was surprised at how easy it was to work the technique. To keep ends to a minimum I did not cut each colour when I had finished with it but carried it up the side for the next time. I did cut each colour once in the middle. I was surprised at how quickly the knitting went. My dates on Ravelry are not accurate as I cast on before we went away but did not work on it until we returned.
This photo was taken as soon as the scarf was finished but I have since blocked it and it looks better.
Firstly a baby hat. I found the pattern through a blog. It is Knit Baby Hat by Bernat. The pattern is worked flat and seamed but I changed to working on the round. I used Red Heart Soft left over from this hat so I worked the smallest size to allow for the thicker yarn. I also worked more increases as 20 stitches is too many to draw up especially with a worsted weight yarn.

The other finished item is a scarf knitted for charity. The suggestions for March were scarves - not my favourite thing to make. Mostly I have been crocheting the charity items as it is usually quicker but I didn't feel like crocheting a scarf so I chose the knitting pattern. It is the windward waves pattern (not capitalized) and is available on Ravelry. The pattern calls for three colours so ideal for using leftovers. The yarn had been used in the hats I made in January and February. With this pattern it was definitely advantageous to be able to knit backwards - ie moving stitches from the right needle to the left needle. I hadn't done this for a while and I was surprised at how easy it was to work the technique. To keep ends to a minimum I did not cut each colour when I had finished with it but carried it up the side for the next time. I did cut each colour once in the middle. I was surprised at how quickly the knitting went. My dates on Ravelry are not accurate as I cast on before we went away but did not work on it until we returned.
This photo was taken as soon as the scarf was finished but I have since blocked it and it looks better.
Wednesday, April 9, 2014
WIPping Wednesday (Second One For April)
I just noticed that last week's post sat in the drafts folder. It has just been published but if you are a regular reader of the blog (hi husband) now you know why you think you are a week behind.
Exciting news to report. I have finished two items since last week. The hat that I mentioned casting on is not only finished but also mailed off to Canada. Also finished is the scarf I was knitting for charity. Photos of these will appear soon.
I haven't picked up the shawl to work the cast off but I have reached the toe on the second sock. I now have to decide if I want the socks to be longer. The first sock doesn't look very long but it fits fine, I will measure against other socks that I know fit well to see if I should/could add further rows. I also pulled out 47 rows of another project that was very close to being finished but when I tried it on I didn't like one of the patterns so out the extra rows went. The good thing about this is that it is stocking stitch knit in the round so now I have a project that I can take to book club next week.
And I didn't cast on anything new. Although that will change as I will start a new charity project. I haven't cast on the tea cosy for March and as much as I would like to make the pattern for April, I don't think I have enough yarn in different colours. It needs two shades of green and three shades of another colour.
So for once I can report that projects finished exceed projects started.
Exciting news to report. I have finished two items since last week. The hat that I mentioned casting on is not only finished but also mailed off to Canada. Also finished is the scarf I was knitting for charity. Photos of these will appear soon.
I haven't picked up the shawl to work the cast off but I have reached the toe on the second sock. I now have to decide if I want the socks to be longer. The first sock doesn't look very long but it fits fine, I will measure against other socks that I know fit well to see if I should/could add further rows. I also pulled out 47 rows of another project that was very close to being finished but when I tried it on I didn't like one of the patterns so out the extra rows went. The good thing about this is that it is stocking stitch knit in the round so now I have a project that I can take to book club next week.
And I didn't cast on anything new. Although that will change as I will start a new charity project. I haven't cast on the tea cosy for March and as much as I would like to make the pattern for April, I don't think I have enough yarn in different colours. It needs two shades of green and three shades of another colour.
So for once I can report that projects finished exceed projects started.
Wednesday, April 2, 2014
WIPping Wednesday
I am not so sure reporting on WIPs is a good idea when I don't seem to have as many corresponding Finished Fridays. But there are two projects at cast off stage. The always being close to finished shawl just needs to be cast off. Before I started the last row I put a slip knot in the yarn so that I knew that if I got to the slip knot before the end of the row there would not be enough yarn for the row and the cast off row. Well I kept on knitting and the yarn ball was getting smaller but no slip knot. I had convinced myself that I had pulled out the knot without noticing but it appeared just after I finished the row. So, in theory, I have enough yarn to finish but I can't remember if I placed the knot half way along the yarn or made more allowance. Oh well, I'll either be happy or unpicking.
The other item at cast off stage is the scarf I am knitting for charity. I have been working on this frequently as it is really for March. It will still not be finished even when it is cast off as the pattern calls for two rows of single crochet around the edge. This project will appear as a finished item shortly as my aim is one charity item a month and I will still have to make something for April. Because of this project I haven't worked on my socks much.
Yesterday was Tea Cozy Tuesday. Here's the link to the post showing this month's choice. Week 1 is for gathering supplies. There's just one problem with this - I am pretty sure I do not have enough yarn. And I was only going to participate each month if I had yarn in my stash that I could use. But, it would make a really nice gift. I have yarn for March's cosy; so if I make that in April I can just be a month behind or miss April's altogether. (Or buy yarn.)
So without any completed items, what did I do? Cast on something of course. There is a two-fold reason for this. Firstly, yesterday was guild meeting day and I needed a project to take. (What do you mean I could have taken the sock?) Secondly, when we were Skyping with my son and his girlfriend over the weekend she said the weather was still cold and she was desperately making the knits fit the baby until I sent more. Umm, but I'm not knitting anything for you people up there. So I started a hat that I could work on at the meeting. And it would be really good if it made an appearance on Friday.
The other item at cast off stage is the scarf I am knitting for charity. I have been working on this frequently as it is really for March. It will still not be finished even when it is cast off as the pattern calls for two rows of single crochet around the edge. This project will appear as a finished item shortly as my aim is one charity item a month and I will still have to make something for April. Because of this project I haven't worked on my socks much.
Yesterday was Tea Cozy Tuesday. Here's the link to the post showing this month's choice. Week 1 is for gathering supplies. There's just one problem with this - I am pretty sure I do not have enough yarn. And I was only going to participate each month if I had yarn in my stash that I could use. But, it would make a really nice gift. I have yarn for March's cosy; so if I make that in April I can just be a month behind or miss April's altogether. (Or buy yarn.)
So without any completed items, what did I do? Cast on something of course. There is a two-fold reason for this. Firstly, yesterday was guild meeting day and I needed a project to take. (What do you mean I could have taken the sock?) Secondly, when we were Skyping with my son and his girlfriend over the weekend she said the weather was still cold and she was desperately making the knits fit the baby until I sent more. Umm, but I'm not knitting anything for you people up there. So I started a hat that I could work on at the meeting. And it would be really good if it made an appearance on Friday.
Friday, March 28, 2014
Finished Friday
No knitting or crochet projects to show but I do have a number of sewing projects to show off. No surprise that they are all bags. This was going to be a photo heavy post but I was wondering what a button on the photo editing softwear did and it made collages. So here it is, a collage of all the bags I have made recently.

When I made this bag I commented that I was sure that I would make more. I found some shiny material that seemed ideal for a reversible bag by using the right and wrong side of the fabric. The original pattern calls for half-yard of each of two fabrics. I bought two yards. Not surprisingly I had loads of the fabric leftover so I made a reversible drawstring bag. This is different from the other drawstring bags I made as it has a square base and the drawstring is at the top. I purchased ribbon for the drawstring and a toggle.
In this post I showed off my pyramid bag and said I had made other bags. At the top right of the photo you can see the larger pyramid bag I made. I made a tab to cover the bottom of the zipper but after I cut the piece of fabric, I noticed if I folded it just so, I could get a complete cat. So it is bigger than a tab should be. Husband said he liked the tab as it helped with closing the zipper. The bigger bag has a handle made from the same fabric as the lining.
The bags on the bottom and middle right I made for my friend Clair's birthday. Check out her cool stitch markers at Purple Gecko Studio . I used the same fabric for each bag. I wanted the same colour zippers for each bag but they didn't do the colour in the smaller size so I was very pleased with myself that I sewed in a longer zipper and cut to size.
And then, of course, I had to make another bag for myself. I wanted a box bag for all my knitting notions to replace a bag I had stupidly decided I didn't need any more. It is the right size but probably would have been better with more interfacing.
I think that's all my recent sewing to show off. Although it won't be the last of making bags. I still have enough of the shiny material to make one, if not two, bags. And I have some fat quarters waiting.

When I made this bag I commented that I was sure that I would make more. I found some shiny material that seemed ideal for a reversible bag by using the right and wrong side of the fabric. The original pattern calls for half-yard of each of two fabrics. I bought two yards. Not surprisingly I had loads of the fabric leftover so I made a reversible drawstring bag. This is different from the other drawstring bags I made as it has a square base and the drawstring is at the top. I purchased ribbon for the drawstring and a toggle.
In this post I showed off my pyramid bag and said I had made other bags. At the top right of the photo you can see the larger pyramid bag I made. I made a tab to cover the bottom of the zipper but after I cut the piece of fabric, I noticed if I folded it just so, I could get a complete cat. So it is bigger than a tab should be. Husband said he liked the tab as it helped with closing the zipper. The bigger bag has a handle made from the same fabric as the lining.
The bags on the bottom and middle right I made for my friend Clair's birthday. Check out her cool stitch markers at Purple Gecko Studio . I used the same fabric for each bag. I wanted the same colour zippers for each bag but they didn't do the colour in the smaller size so I was very pleased with myself that I sewed in a longer zipper and cut to size.
And then, of course, I had to make another bag for myself. I wanted a box bag for all my knitting notions to replace a bag I had stupidly decided I didn't need any more. It is the right size but probably would have been better with more interfacing.
I think that's all my recent sewing to show off. Although it won't be the last of making bags. I still have enough of the shiny material to make one, if not two, bags. And I have some fat quarters waiting.
Wednesday, March 26, 2014
WIPing Wednesday (no. 2 for March)
You might have noticed a small lack of updates this month. This is because I have been to Spain and decided not to try to update my blog while I was there.
I managed to add two Wips to the pile. I like to take a crochet project on the plane, with a plastic crochet hook so that there is not any question about knitting needles being allowed. I didn't have a crochet project on the go so I started one on the first flight using the yarn I bought as mentioned in my post at the end of February. The good thing about that is that I was working on a project that I really wanted to make; the bad thing is that it used four different colours of yarn every two rows. So I had to have four balls of yarn in my hand luggage. As this project is intended for Christmas it will go to the bottom of my WIPs.
Knitting needles and yarn went in my checked luggage and I did complete one sock and cast on for another while I was away. I used The Fiber Imp yarn shown in this blog post and am knitting a Cookie A pattern from Sock Innovation. This project will be near the top of my WIPs.
I have had to look at my last post to refresh my memory of my other project on the go as I have not got any finished projects to show you. The shawl is at the stage where I have to see if I have enough yarn to complete a row and cast off so there is likely to be more unpicking on that one but it is really close to being finished. I have no idea how many rows of the charity scarf I worked. I remember that the main thing was to get it cast on. I think that should be my main project so that I can finish it before the end of the month and be ready to start another project. The toy is still a yellow blob and I just need some time to finish that. It would be nice if I had something to show next week.
I did not cast on the tea cosy for March. I have chosen the yarn and it should be a quick knit. I would like to complete it in the intended month but I might make it in April instead.
I managed to add two Wips to the pile. I like to take a crochet project on the plane, with a plastic crochet hook so that there is not any question about knitting needles being allowed. I didn't have a crochet project on the go so I started one on the first flight using the yarn I bought as mentioned in my post at the end of February. The good thing about that is that I was working on a project that I really wanted to make; the bad thing is that it used four different colours of yarn every two rows. So I had to have four balls of yarn in my hand luggage. As this project is intended for Christmas it will go to the bottom of my WIPs.
Knitting needles and yarn went in my checked luggage and I did complete one sock and cast on for another while I was away. I used The Fiber Imp yarn shown in this blog post and am knitting a Cookie A pattern from Sock Innovation. This project will be near the top of my WIPs.
I have had to look at my last post to refresh my memory of my other project on the go as I have not got any finished projects to show you. The shawl is at the stage where I have to see if I have enough yarn to complete a row and cast off so there is likely to be more unpicking on that one but it is really close to being finished. I have no idea how many rows of the charity scarf I worked. I remember that the main thing was to get it cast on. I think that should be my main project so that I can finish it before the end of the month and be ready to start another project. The toy is still a yellow blob and I just need some time to finish that. It would be nice if I had something to show next week.
I did not cast on the tea cosy for March. I have chosen the yarn and it should be a quick knit. I would like to complete it in the intended month but I might make it in April instead.
Wednesday, March 5, 2014
WIPing Wednesday First One of March
The count for the past week is one item finished (the tea cosy shown yesterday) and two items cast on. I know it's not good to cast on more than I have finished but I do have an excuse. One of the cast on items is the car project. I finished the last car project in the middle of February and I decided it was about time to start a new one.
The other project I cast on was a scarf for charity. I have mentioned that the group on Ravelry for Operation Gratitude suggest patterns at the beginning of each month. This month was scarf patterns and I decided on the knit pattern - using yarn from stash of course. the pattern is knit lengthwise so there were 211 stitches to cast on. I decided to get the cast on over and done with so that I could work on the scarf whenever I wanted. it too longer to decide which cast on to use than to actually work it. Single crochet is worked all around the scarf so the look of the cast on didn't matter plus if it was a little loose the crochet would adjust for that but I didn't want anything too tight. The cable cast on was ruled out but I didn't want to work a long tail or any variation. With that number of stitches I was unlikely to get the right amount of yarn at the start and although I could work long tail with two ends of yarn this results in three ends having t be sewn in at the start, not a good idea for a scarf. I ended up with the knitted cast on and knit the first row. It did not come out really loose or with gaps between the stitches so we shall see how it looks once I get further into the pattern.
I frogged back the shawl as I said in last week's post and completed the third repeat of pattern D. I weighed the yarn and I should have enough to complete the border pattern E and the cast off.
Also I finished all the knitting for the toy which now needs to be stuffed and sewn up. Still no photos as it really is a yellow blob.
Looking at these WIPs, I'm not sure that I will have any completed items by next week. We shall see.
The other project I cast on was a scarf for charity. I have mentioned that the group on Ravelry for Operation Gratitude suggest patterns at the beginning of each month. This month was scarf patterns and I decided on the knit pattern - using yarn from stash of course. the pattern is knit lengthwise so there were 211 stitches to cast on. I decided to get the cast on over and done with so that I could work on the scarf whenever I wanted. it too longer to decide which cast on to use than to actually work it. Single crochet is worked all around the scarf so the look of the cast on didn't matter plus if it was a little loose the crochet would adjust for that but I didn't want anything too tight. The cable cast on was ruled out but I didn't want to work a long tail or any variation. With that number of stitches I was unlikely to get the right amount of yarn at the start and although I could work long tail with two ends of yarn this results in three ends having t be sewn in at the start, not a good idea for a scarf. I ended up with the knitted cast on and knit the first row. It did not come out really loose or with gaps between the stitches so we shall see how it looks once I get further into the pattern.
I frogged back the shawl as I said in last week's post and completed the third repeat of pattern D. I weighed the yarn and I should have enough to complete the border pattern E and the cast off.
Also I finished all the knitting for the toy which now needs to be stuffed and sewn up. Still no photos as it really is a yellow blob.
Looking at these WIPs, I'm not sure that I will have any completed items by next week. We shall see.
Tuesday, March 4, 2014
Tea Cosy Tuesday and Finished Friday
It is the first Tuesday of the month and time for another tea cosy. I've chosen my yarn - left overs in stash - but haven't decided when to cast on.
I finished February's on the 28th. So it qualifies for Tea Cosy Tuesday and Finished Friday. Although I thought I was going to run out of the purple yarn I made it all from left overs. The pattern had a flower on the top but we liked it with the top of the lid showing.

You can find the pattern here.
And I can show the baby cardigan that I finished a week ago.

I used two 50g balls of yarn and a small amount of another yarn in my stash, probably Sirdar Snuggly but it didn't have a label. I didn't have enough yarn to knit the sleeves to the length in the pattern but I wasn't worried about that as sleeves on baby garments are usually too long. The pattern is from a collection from Sirdar that I bought when my niece was a baby and she is now 15! I made her the sweater and hat shown on the front cover.

I now want to make another cardigan from the collection for the other baby but that will involve buying yarn. I thought I had plenty of baby yarn but I don't have enough to make a complete garment.
I finished February's on the 28th. So it qualifies for Tea Cosy Tuesday and Finished Friday. Although I thought I was going to run out of the purple yarn I made it all from left overs. The pattern had a flower on the top but we liked it with the top of the lid showing.
You can find the pattern here.
And I can show the baby cardigan that I finished a week ago.
I used two 50g balls of yarn and a small amount of another yarn in my stash, probably Sirdar Snuggly but it didn't have a label. I didn't have enough yarn to knit the sleeves to the length in the pattern but I wasn't worried about that as sleeves on baby garments are usually too long. The pattern is from a collection from Sirdar that I bought when my niece was a baby and she is now 15! I made her the sweater and hat shown on the front cover.

I now want to make another cardigan from the collection for the other baby but that will involve buying yarn. I thought I had plenty of baby yarn but I don't have enough to make a complete garment.
Sunday, March 2, 2014
Sew Cute
I could have kept with the alliterations and titled this Sewing Sunday especially as I have a few bags to show but this little bag deserved a post of its own.
Through various links I found a pattern for a pyramid bag. I have wanted a pyramid shaped bag for a long time but haven't bought one as Esty is such a pain to search and want is entirely different from need.
Now I can make my own. I made the pattern as written but I have successfully upsized it to to a project bag. This is a perfect size for stitch markers but I am not intending to keep this one for myself. The best thing about this bag - cost. The fabric was left over from these bags, the ribbon was left over from the baby booties and I used a coupon when I purchased the zipper from Jo-Ann's.
I made this bag last Sunday and I followed it with a larger pyramid bag and a box bag and then yesterday as it was a rain day (like a snow day but warmer), I made another box bag and small pyramid bag. A separate post will include details of these together with a couple of bags I made at the end of January which I have not shown yet.
The photo was taken with my phone with the bag on my computer keyboard so you have some idea of size. (The zipper is 10 cm in length.)
Through various links I found a pattern for a pyramid bag. I have wanted a pyramid shaped bag for a long time but haven't bought one as Esty is such a pain to search and want is entirely different from need.
Now I can make my own. I made the pattern as written but I have successfully upsized it to to a project bag. This is a perfect size for stitch markers but I am not intending to keep this one for myself. The best thing about this bag - cost. The fabric was left over from these bags, the ribbon was left over from the baby booties and I used a coupon when I purchased the zipper from Jo-Ann's.
I made this bag last Sunday and I followed it with a larger pyramid bag and a box bag and then yesterday as it was a rain day (like a snow day but warmer), I made another box bag and small pyramid bag. A separate post will include details of these together with a couple of bags I made at the end of January which I have not shown yet.
The photo was taken with my phone with the bag on my computer keyboard so you have some idea of size. (The zipper is 10 cm in length.)
Subscribe to:
Posts (Atom)